Home › Calculators › Concrete Calculator
🧱

Concrete Calculator

Work out how much concrete you need for a slab, round pier, column or steps. Get cubic yards, bags with a waste allowance and a cost estimate. Free.

About this tool

Ordering concrete is stressful when you do not know how much to buy: too little and the pour stops halfway, too much and you pay for waste. This free concrete calculator takes the guesswork out. Enter the size of your slab, round pier, column or steps and it works out the volume in cubic feet and cubic yards, then tells you how many bags you need for the bag size you pick — with a waste allowance built in, and a cost comparison between bags and ready-mix if you enter prices. It uses the standard bag volumes from the manufacturers' data sheets. There is nothing to install and no signup, and the result appears in seconds.

By Azhar Hussain · Last updated: 19 November 2026

How to use

Pick what you are pouring first: a rectangular slab or footing, a round slab, a round column or sonotube pier, or a flight of steps. Only the measurements for that shape are shown. Measure in feet for lengths and in inches for thickness, then pick your bag size: 80 pound bags are the most common for big jobs, while 40 pound bags are easier to carry. The waste allowance starts at 10 percent — change it to 5 for tidy forms or 15 for rough ground. Press Calculate Concrete to see the volume, the cubic yards and the number of bags, with the waste included. Add a price per bag or per cubic yard to compare the two ways of buying. The tool rounds bags up, because you cannot buy part of a bag.

The math behind it

Volume comes from length times width times thickness, with the thickness changed from inches to feet by dividing by 12. A slab 10 feet long, 10 feet wide and 4 inches thick is 10 times 10 times 0.333, which is 33.33 cubic feet. There are 27 cubic feet in a cubic yard, so that slab needs 1.23 cubic yards. Bag counts come from the volume each bag fills: an 80 pound bag fills 0.6 cubic feet, a 60 pound bag fills 0.45, a 50 pound bag fills 0.375 and a 40 pound bag fills 0.3. So the same slab needs 56 bags of 80 pound concrete, or 62 with the 10 percent waste allowance. A round column uses pi times the radius squared times the height, and steps are a solid pour: each step carries the full volume of every step above it.

The four shapes and their formulas

Every shape reduces to a volume in cubic feet, then to cubic yards by dividing by 27, because a cubic yard is 3 feet on each side.

ShapeFormula (cubic feet)Example
Rectangular slab or footingLength × width × (thickness ÷ 12)10 × 10 ft, 4 in = 33.33 cu ft
Round slabπ × radius² × (thickness ÷ 12)6 ft dia, 4 in = 9.42 cu ft
Round column / sonotubeCount × π × radius² × height12 in dia, 4 ft deep = 3.14 cu ft each
Steps (solid pour)Width × (tread ÷ 12) × (riser ÷ 12) × N(N+1) ÷ 24 steps, 3 ft wide = 15.00 cu ft

A footing uses the same formula as a slab — it is just narrow and deep instead of wide and thin. A wall is entered the same way: length, height as the width, and thickness as the depth. Steps are the shape people most often underestimate, because the bottom step supports the full volume of every step above it.

Bag yields: how much one bag makes

These are the yields printed on the manufacturers' data sheets for standard concrete mix (Quikrete Concrete Mix No. 1101 and Sakrete's standard mix). Bags per cubic yard is just 27 divided by the yield.

Bag sizeYield per bagBags per cubic yardBest for
80 lb0.60 cu ft45Slabs and driveways — cheapest per cubic foot
60 lb0.45 cu ft60Walkways and solo work — the middle ground
50 lb0.375 cu ft72Smaller jobs where 60 lb is too heavy
40 lb0.30 cu ft90Small repairs, fence posts — easiest to carry

Fast-setting, high-strength and specialty mixes yield differently — always use the figure printed on the bag you actually buy. And remember the yields allow nothing for waste: the manufacturers' figures assume a perfect pour on a perfect base, which no real job has.

Waste allowance: 5, 10 or 15 percent?

Order more than the exact volume. Spills, formwork that spreads slightly, an uneven subgrade and the concrete left in the chute or mixer all eat into the amount, and running short halfway through a pour is far more expensive than a spare bag. Ten percent is the standard allowance for most home projects. Use 5 percent for tidy ready-mix forms on a well-compacted base, and 15 percent for irregular shapes, sloped ground, a gravel subgrade that may have voids, or your first concrete project. The calculator applies the allowance before rounding bags up, so the bag count already includes it.

Bags or ready-mix?

The break-even point is roughly one cubic yard. One cubic yard needs 45 eighty-pound bags — that is 3,600 pounds of material to open, dump, mix and pour by hand. Under half a cubic yard (about 22 bags) bagged concrete is practical and cost-effective; above a yard, a ready-mix delivery or a rented mixer trailer is usually cheaper and far easier. Worked comparison: a 10 by 10 foot slab at 4 inches needs 62 bags of 80 lb mix with waste, about $401 at $6.47 a bag, against 1.36 cubic yards of ready-mix at about $190 at $140 a yard before delivery — bags cost about double here. A full ready-mix truck carries roughly 10 cubic yards, and most plants sell in quarter- or half-yard steps, so round your order up to the next step they offer. Enter your own prices in the calculator for a comparison on your job.

Worked examples

Patio slab, 10 × 10 ft at 4 in. 33.33 cubic feet, 1.23 cubic yards, 56 bags of 80 lb mix — or 62 bags with the 10 percent waste allowance (1.36 cubic yards). Bags are practical at this size, but ready-mix is cheaper.

Garage slab, 20 × 12 ft at 4 in. 80.00 cubic feet, 2.96 cubic yards, 134 bags — or 147 with waste. Firmly ready-mix territory: that is over two tonnes of bags.

Round patio, 6 ft diameter at 4 in. 9.42 cubic feet, 0.35 cubic yards, 16 bags of 80 lb mix. A small bag job.

Deck footings, twelve 12-inch sonotubes 4 ft deep. 3.14 cubic feet each, 37.70 cubic feet total, 1.40 cubic yards, 63 bags — or 70 with waste. A ready-mix short load or a mixing trailer beats hauling 70 bags.

Steps, 4 steps 3 ft wide with a 12-inch tread and 6-inch riser. 15.00 cubic feet, 0.56 cubic yards, 25 bags — or 28 with waste. Steps are the most commonly underestimated pour, because the lower steps carry the volume of everything above them.

Shed base, 12 × 10 ft at 4 in. 40.00 cubic feet, 44.00 with waste, 1.63 cubic yards, 74 bags of 80 lb mix.

Thickness and strength (PSI) guide

Thickness alone does not make a slab last — a compacted base, reinforcement, control joints and a proper cure matter just as much. Check your local code before pouring; the figures below are the usual residential guidance.

ProjectThicknessMix strength
Sidewalk, patio, walkway4 inches3,000 PSI
Shed base, garden path4 inches3,000 PSI
Driveway (cars)4–6 inches (5–6 recommended)3,500–4,000 PSI
Garage floor4–6 inches3,500–4,000 PSI
Driveway (trucks, RVs)6 inches minimum4,000–4,500 PSI
Footings and foundationsProject and code dependent3,000–4,000 PSI
Hot tub pad6 inches4,000 PSI

The building code minimum for a slab on ground is 3.5 inches. A driveway in a freeze-thaw climate should use a 4,000 PSI mix with air entrainment, which protects against scaling from road salt.

Curing: when can I walk and drive on it?

Concrete gains strength gradually, and the timeline below assumes normal weather (about 65 to 75 °F) and a standard mix. Cold or hot weather moves every number.

MilestoneWhen
Walk on it24 to 48 hours
Light furniture, grillAbout 3 days
Park a passenger car7 days (about 70% of design strength)
Heavy trucks, RVs, loaded vehicles28 days
Full design strength28 days
Seal the slabNot before 28 days

Keep the slab moist for the first 7 days for the best results — drying too fast makes it brittle. Do not use de-icing salts on new concrete in its first winter.

Troubleshooting and method

Ran short mid-pour. The usual causes are an uneven subgrade (the base was deeper than measured in places), forms that spread, or no waste allowance. Measure the thickness in several places, not just one, and keep the 10 percent allowance. If you do run short, finish the section you are on and treat the rest as a second pour with a proper joint — never feather a thin patch over the edge.

Ordered far too much. Check the thickness first: an extra inch over a whole slab adds 25 percent to the volume at 4 inches. Measure again, and return unopened bags — most suppliers take them back.

Method. Volume = length × width × (thickness ÷ 12) for slabs, π × radius² × height for columns, and the solid-pour steps formula above. Cubic yards = cubic feet ÷ 27. Bags = ceil(cubic feet × (1 + waste%) ÷ yield per bag). All figures are planning estimates — confirm with your supplier and local code.

Sources. Bag yields from Quikrete Concrete Mix No. 1101 and Sakrete data sheets, checked November 2026 against CalculatingConcrete (updated 17 November 2026), HomeDIYOnline, NailTheMath, MeasureThenBuild, FixnFigure, Yardstickly, BulkMaterialCalculator and CalcTheJob. Shape formulas, waste guidance and the bags-vs-ready-mix break-even from MaterialWright, Construction Bros, CalculatorsHouse and OnlineConvers. Thickness, PSI and curing figures from the IRC, HammerCalculator, MyConcreteCalc, CJM Concrete, ProBuilderCalc and BuildCalcu.

Frequently asked questions

How many bags of concrete do I need?
It depends on the volume and the bag size. Work out the cubic feet first, then divide by the volume of one bag: 0.6 cubic feet for an 80 pound bag, 0.45 for a 60 pound bag, 0.375 for a 50 pound bag and 0.3 for a 40 pound bag. This calculator does the whole calculation for you, including a waste allowance — a 10 by 10 foot slab at 4 inches needs 56 bags of 80 pound mix, or 62 with 10 percent waste.
How many cubic feet are in a cubic yard?
There are 27 cubic feet in one cubic yard, because a cubic yard is 3 feet long, 3 feet wide and 3 feet high. Divide cubic feet by 27 to get cubic yards, which is the unit ready-mix concrete is sold in.
How thick should a concrete slab be?
Most patios, walkways and shed bases are 4 inches thick, which is enough for foot traffic and light use. Driveways and garage floors are usually 5 to 6 inches thick, because they carry cars. Heavy vehicles and hot tubs need 6 inches or more.
Should I buy extra concrete?
Yes, order about 10 percent more than the calculation says. Spills, uneven ground, formwork that is slightly out of square and waste during the pour all eat into the amount, and running short halfway through a pour is far more expensive than a spare bag. Use 5 percent for tidy forms on a compacted base, or 15 percent on rough ground or your first project.
What size concrete bag is best?
80 pound bags are the cheapest per cubic foot and suit big jobs, but each bag is heavy to lift and mix. 60 pound bags are a good middle ground, 50 pound bags suit smaller jobs where 60 is too heavy, and 40 pound bags are the easiest to carry and mix by hand for small repairs and fence posts.
How much concrete do I need for a round column?
Use the cylinder formula: pi times the radius squared times the height. A 12-inch diameter tube 4 feet deep holds 3.14 cubic feet, which is 6 bags of 80 pound mix. Twelve such sonotube footings need 37.7 cubic feet, or about 70 bags with a 10 percent waste allowance. Choose the column shape in the calculator and it does the maths, including the count.
How do I calculate concrete for steps?
Steps are poured as a solid mass, not as separate treads. The volume is the width times the tread depth times the riser height times N(N+1) divided by 2, where N is the number of steps — the bottom step carries the volume of every step above it. Four steps 3 feet wide with a 12-inch tread and 6-inch riser need 15 cubic feet, or 25 bags of 80 pound mix (28 with waste). Choose the steps shape in the calculator.
How many bags of concrete are in a cubic yard?
45 bags of 80 pound mix, 60 bags of 60 pound, 72 bags of 50 pound, or 90 bags of 40 pound. A cubic yard is 27 cubic feet, and each bag yields 0.6, 0.45, 0.375 or 0.3 cubic feet once mixed. With a 10 percent waste allowance those become 50, 66, 80 and 99 bags.
Should I use bags or order ready-mix?
The break-even is about one cubic yard. Under half a cubic yard (about 22 bags of 80 pound mix) bags are practical and cheap. Above a yard, ready-mix is usually cheaper and far easier — one yard is 45 eighty-pound bags, or 3,600 pounds to mix by hand. Enter your prices in the calculator to compare the two on your job.
How long does concrete take to cure?
You can walk on it after 24 to 48 hours, park a passenger car after about 7 days when it has reached roughly 70 percent of its design strength, and it reaches full strength at 28 days. Keep heavy trucks and RVs off for 28 days, keep the slab moist for the first 7 days, and do not seal it before 28 days.
What PSI concrete do I need?
Patios, sidewalks and shed bases use 3,000 PSI. Residential driveways use 3,500 to 4,000 PSI, and driveways that see trucks or RVs regularly use 4,000 to 4,500 PSI. Footings and foundations use 3,000 to 4,000 PSI. In a freeze-thaw climate, a driveway mix should include air entrainment to resist salt scaling.
What if my bag lists a different yield?
Trust the bag. Fast-setting, high-strength, fibre-reinforced and other specialty mixes yield differently from standard mix — the 0.6, 0.45, 0.375 and 0.3 cubic foot figures are for standard Quikrete No. 1101 and Sakrete mixes. If your bag prints a different number, divide your cubic feet by that number instead.